Skip to content
ThackstonDesign + Build

How a project runs, start to finish

Six phases. Two of them are where money changes hands, and both are marked, because those are the moments every competitor buries.

The money question is on The Right Fit — this page is about how the engagement runs, whichever room it is in.

  1. Discovery

    We come to your house, walk the space, listen to what is not working, and talk honestly about range and timing before anybody draws anything. It is free, it happens at your house, and it ends in writing.

    An older kitchen as found, empty, before any work has started.
    What we do
    Walk the house, ask what is not working, and put a scope and a realistic investment band on paper.
    What you do
    Show us the house and say what you actually want, including the parts you think are unreasonable.
    What you get
    A written summary of scope and a realistic investment band
  2. Design Agreement

    PaymentFirst payment — the design fee

    We put the design phase under a signed agreement with a defined fee, a defined scope of drawings, and a defined number of revisions. You own the drawings. This is the first time money changes hands and we would rather you saw it coming long before you got here.

    A fountain pen resting on a folded sheet of heavy unmarked paper on a studio table.
    What we do
    Define the design fee, the scope of drawings, and how many revisions are included — then put all three in one document.
    What you do
    Sign, and pay the design fee.
    What you get
    Signed design agreement
  3. Design & Selections

    Measured drawings, layout options, structural review, and then selections — tile, cabinetry, fixtures, finishes — with our Selections Coordinator, inside the design phase rather than after it. That single sequencing decision is the reason our projects finish closer to their original schedule than they otherwise would.

    Tile, stone and timber samples laid out in a grid on a studio table.
    What we do
    Measure, draw, review the structure, and run every selection to a calendar you get on day one.
    What you do
    Make decisions with us, in a showroom or at our table, on a schedule we hand you at the start.
    What you get
    Construction drawings and a complete selections schedule
  4. Fixed-Price Proposal

    PaymentConstruction contract — the payment schedule starts here

    We price the drawings we produced, with the trades who will do the work, and hand you one number with the scope attached. It is a fixed price with an itemized scope, not an estimate — and it is the first number we will ever ask you to sign.

    A set of rolled drawings standing on a plain table beside a scale rule.
    What we do
    Price the drawings with the trades who will build them, and attach the itemized scope, the payment schedule, and the dates.
    What you do
    Read it, ask everything, and either sign it or don't — no pressure and no expiry games.
    What you get
    A fixed-price construction agreement with itemized scope, payment schedule, and start and completion dates
  5. Construction

    One production manager and one project manager. Weekly written updates. A schedule you can see. Change orders in writing, priced, and signed before the work happens — never after.

    A room framed and wired, studs and joists exposed, protective board over the floor.
    What we do
    Run the field, the trades, and the inspections, and write you a real update every week.
    What you do
    Live in your house, mostly. Come to the weekly walk if you want to.
    What you get
    The work
  6. Warranty Walk

    We walk the finished project with you, close the punch list, hand over manuals and the warranty document, and come back at eleven months to look again before the first year closes. Uninvited.

    A finished room, entirely empty and clean, one window open to the garden.
    What we do
    Close the punch list, hand over the written warranty and the manuals, and return at eleven months.
    What you do
    Tell us what is not right. All of it.
    What you get
    Warranty certificate and the eleven-month return visit

What is in the contract you sign at phase 4

The Fixed-Price Proposal becomes the construction agreement. It states the scope in itemized detail, the payment schedule and the dates, and every change to it is priced and signed by both of us before the work happens — never after.

The contract terms and the lien notice, in full

The five-year workmanship warranty

Covered

  • Framing, drywall, and structural work we performed
  • Tile setting and the waterproofing assemblies behind it
  • Cabinetry and millwork installation
  • Trim, and paint adhesion on surfaces we prepared
  • The installation of the fixtures, appliances and systems we put in

Not covered

  • The manufactured products themselves — appliances, fixtures, windows, flooring products and cabinetry finishes carry their own written manufacturer warranties
  • Normal settlement cracking and the seasonal movement of wood
  • Damage from misuse or deferred maintenance
  • Water intrusion originating outside our scope of work
  • Work performed by others after us
Term
five years, from the date of substantial completion
Transfer
Transferable once to a subsequent owner within the term.
Full text
The full written warranty is part of your contract, is handed to you at the warranty walk, and we will email a copy any time you ask. Scope, exclusions and source.

Questions about the process

Tell us about your house.

A Discovery visit is free, it happens at your house, and it ends with a written summary of scope and a realistic investment band.

A renovated hallway at dusk looking toward a lit room at the far end.
CallStart a conversation