Skip to content
ThackstonDesign + Build

Custom Cabinetry in Alpharetta, GA

Custom cabinetry is what lets a room fit its house instead of fitting a catalogue's increments. We use it where it earns its place — an odd wall, a specific storage problem, a period house where stock proportions look wrong — and we will tell you where semi-custom does the same job.

A wall of inset cabinetry with a hand-run bead, two doors standing open on empty shelves.

What a project like this includes

  • Measured elevations drawn for every run, so nothing is guessed at in the field
  • A straight recommendation on custom versus semi-custom, run by run rather than for the whole room
  • Door style, drawer construction, hardware and finish specified and sampled during design
  • Interior fittings planned around what actually goes in each cabinet
  • Scribes, fillers and trim detailed against walls that are never square
  • Installation by our own carpenters, to the elevation that was drawn
  • Finish repair and touch-up at completion
  • The five-year workmanship warranty on our installation

What it usually does not

  • Counters, appliances and sinks, unless they are in the project's scope
  • The manufacturer's finish warranty, which is theirs rather than ours
  • Refinishing existing cabinetry — a different trade and a different conversation

Anything on this list can be brought into scope. It is here because it is not automatically in it, and knowing that now is worth more than finding out in month three.

How this work moves through our six phases

  1. 1

    Discovery

    We walk the house and put scope and a realistic band in writing.

  2. 2

    Design AgreementPayment

    Design goes under a signed agreement with a defined fee and scope.

  3. 3

    Design & Selections

    Drawings, structural review, and every selection locked before construction.

  4. 4

    Fixed-Price ProposalPayment

    One fixed price, from the trades who will build it, with the scope attached.

  5. 5

    Construction

    One production manager, one project manager, weekly written updates.

  6. 6

    Warranty Walk

    Punch list closed, warranty handed over, and we come back at eleven months.

The whole process, in detail

What this usually involves

We publish four investment ranges and our minimum of $60,000, along with what each range typically includes and who we are honestly not the right firm for. Your own number comes from the Fixed-Price Proposal in phase four, once the drawings exist.

See the four ranges

Browsing rather than scoping? Kitchens in the portfolio is the same work photographed rather than described.

Projects featuring this work

Questions about custom cabinetry

  • How long does custom cabinetry take?

    Drawing and approval runs three to five weeks; fabrication is typically eight to fourteen weeks after that, and it is usually the longest lead time in a kitchen. This is why it is ordered during design rather than after demolition.

  • What investment range does cabinetry usually land in?

    Cabinetry is almost always a line inside a larger project rather than a project of its own, so it lands wherever that project lands. The four ranges are published on The Right Fit.

  • Do we actually need custom?

    Often not, and we will say so. Semi-custom lines have got very good and they solve most rooms. Custom earns its place at an odd wall, an unusual ceiling height, a specific storage problem, or a period house where stock proportions read wrong — and in a lot of kitchens the honest answer is semi-custom everywhere except one run.

  • What does the five-year workmanship warranty cover on cabinetry?

    Our installation — level, plumb, scribed, and fastened correctly — for five years from substantial completion. The cabinetry finish and the manufactured components carry the maker's own written warranty.

Tell us about your house

Four short steps. It goes straight to Priscilla, who will call within one business day to set up a free Discovery visit.

  1. The project
  2. The house
  3. Tell us
  4. You
What you're thinking about
Which rooms are you thinking about?

Choose up to three. If it is genuinely everything, say so in the description on step three and we will take it from there.

0 of 3 chosen.

How far does it go?

Related work

  • Kitchens

    Layout first, then everything else. Most of our kitchens move a wall.

  • Home Offices

    Sound separation, real lighting, storage that is not a bookcase, a door that closes.

CallStart a conversation