Basement Finishing in Roswell, GA
An egress window is the one part of a basement project that happens on the outside of the house, and in Roswell's historic overlay that is exactly the part that changes the calendar.

The egress window is an exterior alteration, and it is a Major certificate
Finishing a basement into habitable space requires an egress opening — a window or a door, sized to code, with a well and drainage where the sill is below grade. Everything else in the project is interior and invisible; that one element is a permanent, visible change to an exterior elevation and to the grade beside it. Inside Roswell's local historic overlay that puts the project squarely inside the Certificate of Appropriateness process at UDC § 13.7, and an egress window is not on the short administrative list at § 13.7.4 that the Zoning Director can approve on his own. So it is a Major certificate, before the Historic Preservation Commission, on the forty-five-day clock at § 13.7.10.B — plus the staff orientation an applicant must complete before an application is even accepted. It is entirely achievable and it is six to ten weeks of calendar that has to sit at the front of the schedule rather than in the middle of it. Outside the overlay, which is most of Roswell's 1980s housing, the same window is an ordinary permit item.

The same caveat everywhere: water first, and we mean first
Every basement project we take, in every town, starts with grading, downspouts and the wall itself before anything is framed. Most of what looks like a foundation problem is a drainage problem and is inexpensive; some of it is not. Either way you will know which one you have before you sign a construction agreement, and if there is an unresolved water problem we will not frame over it. A beautiful finished basement above one is a very expensive way to store a dehumidifier.
What this covers
Each of these is a service in its own right, offered in Roswell and everywhere else we work. What follows is how it goes in Roswell specifically, rather than a fifteenth thing we do.
Basement Finishing
Water, moisture, egress, ceiling height and mechanicals — all five, first.
Questions about basement finishing
How long does a basement take?
Design is typically six to ten weeks. Construction usually runs three to five months, and the range is mostly about how much mechanical relocation the ceiling needs. Egress well excavation adds a weather-dependent week.
What investment range does a finished basement usually land in?
A finished basement is the shape of our second band. All four ranges are published on The Right Fit, along with what each one typically includes.
What if there is water down there?
Then we deal with it before anything else, and we tell you at Discovery rather than after demolition. Most of what looks like a foundation problem is a grading and downspout problem, which is cheap. Some of it is not. Either way you will know which one it is before you sign a construction agreement.
What does the five-year workmanship warranty cover in a basement?
Our workmanship for five years from substantial completion. It does not cover water intrusion originating outside our scope — which is exactly why the water assessment comes first and why we put what we found in writing.
Does a basement need a permit?
In every jurisdiction we work in, yes — finishing a basement creates habitable space and triggers egress and inspection requirements. Who issues it depends on your address, and in unincorporated areas that is the county rather than a city.
Tell us about a house in Roswell
The town is pre-filled. Four short steps, and it ends with a call from Priscilla within one business day.
Tell us about your house.
A Discovery visit is free, it happens at your house, and it ends with a written summary of scope and a realistic investment band.
